Leadership in Energy and Environmental Design is an internationally recognized Green Building evaluation system Council, 2012. When sing the undertakings located in Sri Lanka, the evaluation system which is usually followed is GreenSLA® Rating System for Built Environment. And the presenting organic structure of this system is called GBCSL ( Green Building Council, 2010 ) . There for this study is limited to the GBCSL evaluation system.

This study is structured on how to obatain a GBCSL Platinum evaluation for the proposed juice mill in southern state of Sri Lanka. By sing the current design and other assorted facets of the proposed undertaking, some of the cardinal clauses of GBCSL evaluation system will be choosen to chiefly concentrate on and accomplish the mark.

We Will Write a Custom Essay Specifically
For You For Only $13.90/page!


order now

Key concerns given in the undertaking are,

Site extent is about 10 estates and faces a river

Use 100 % bio gas for the operation

Minimal perturbation to the bing ecology

Waste H2O treatement and solid waste direction

Wholly hygenic environment

Undertaking location is selected utilizing the Google map and all the undertaking description inside informations are premises. Other extra premises are clearly mentioned in the relevant countries where they are used.

Undertaking Description

Undertaking name: Martz Fruit Juice Manufacturers Private Limited.

Client: Dubai Investments LLC.

Contractor: TUDAWE Brothers Private Limited.

Adviser: Calgary Project Consultants.

Green Advisers: Green Technologies FZCO.

Location: Undertaking site is located,

In southern state of Sri Lanka

Along with the seashore of Polwatta Ganga and 30meters off from it

300meters off from Kapuwatha Bus halt

380meters off from the Koledanda coach halt

410 metres off from kapuwatha Road

1.2 kilometres off from the nearest Paddy field

60 metres off from the nearest wetlands

Figure – Location Map

( Google )

Site trial inside informations: It is assumed that the undertaking site is partly a green field. And a part of the site is found as a antecedently developed land. Significant sum of asbestos taints besides found at site.

Design inside informations: Entire Site area- 40,000 M2

Entire Building country – 15,000 M2

Internal Roads and paving country -2500 M2

Parking country – 2500 M2

Native plantation country – 20,000 M2

Entire edifice roof will be vegetated

Figure – Site Layout Plan

Basically GBCSL addresses the undermentioned eight facets of its Prerequisites and credits ( Green Building Council, 2010 )

Table – GBCSL Rating Standards

Standards

Points

Management

4

Sustainable Sites

25

Water Efficiency

14

Energy & A ; Atmosphere

21

Material & A ; Resources

21

Indoor Environmental Quality

13

Innovation & A ; Design Process

4

Social & A ; Cultural consciousness

3

Entire Points Available

100

( Green Building Council, 2010 )

Sustainable Sites

1.1 Site Choice

Aim: To do certain that a undertaking is non being developed in an inappropriate site and to avoid the impact of environment on it.

Status: Achieved

Attainment: As per the undertaking description, current location of the undertaking is carry throughing the undermentioned demands

Minimal 15 metres off from any H2O organic structures.

Minimal 30 metres off from any wetlands.

Not to be located on a farm land, a public parkland or a land 5ft above the 100 twelvemonth old inundation lift

Site should non be a home ground of any endangered species ground.

Points: Five

1.2 Development denseness and community connectivity

Aim: Rather than doing a new substructure service, use the bing substructure of nearby urban country and protect Greenfield.

Status: Achieved

Attainment: Supply two prosaic crossings and a pes -bridge within the 1/2mile radius.

Assume that the mean denseness of the residential country is 10units/acre within the A?mile radius.

The site locality program below shows the residential developments and all the community service locations within the A? stat mi radius of the site.

Figure – Development Density ( Google )

Table – Developments

Idaho

Name callings of the Developments

1

Hatton National Bank

2

St Peters Church

3

Kapuwatha Children ‘s Park

4

David Peris Motors ( Pvt ) Limited

5

Pearl Library

6

V-Fitness Gym

7

Kapwatha Jumma Masjid

8

Highland gardens Restaurant

9

DJ Club

10

Kapuwatha Buddhist temple

( Premise )

Points: Four

1.3 Brownfield Redevelopment

Aim: To do a development in an already damaged or contaminated site.

Status: TBA

Attainment: Site trial consequence shows that portion of the site is contaminated by asbestos. Following redress stairss must be taken prior to get down the building.

Redress program must be prepared.

Asbestos superfund countries must be cleaned up harmonizing to the above prepared program

Onsite monitoring of the redress program

Ensure all actions are completed before the habitation

Points: One

1.4 Alternate Transportation system

Aim: To utilize the public transit instead than implementing a new beginning.

To supply parking installations to the internal staff

Status: Achieved

Attainment: As mentioned in the site location inside informations, there are two bus Michigans within the 1/4mile radius from the site.

Key program shows that the undertaking includes 200 auto parking slots and 20 Truck parking slots.

Those two installations meet the LEED demands for this peculiar recognition.

Additionally, supply 150 ( which are 5 % of the entire figure of workers ) secure motorcycle racks and altering installations.

Points: Three

1.5 Reduce Site Disturbance

1.5.1 Protect or Restore Habitat

Aim: To advance biodiversity at site by reconstructing native flora up to 50 % of the site

Status: Achieved

Attainment: As mentioned in the undertaking inside informations, 15000 M2 ( 50 % of the entire site except the edifice footmark ) of native plantation will be restored.

Points: Two

Development Footprint

Aim: To maintain an unfastened infinite of 20 % of the entire site country.

Status: Achieved

Attainment: Vegetated roof country can be considered as an unfastened infinite which will be the entire edifice roof country ( 15,000 M2 or around 37 % of the entire site ) as mentioned in the undertaking natures.

Points: Two

1.6 Storm Water Design Quantity Control 1

Aim: To pull off storm H2O discharge

Status: Achieved

Attainment: This undertaking contains vegetated roof and swales to an adequate graduated table. This will of course cut down the impenetrability of the storm H2O.

In add-on to that, bing impenetrability will be measured and proper design will be made at the pre development phase to cut down the current measure by 25 % at the station development phase.

Points: Three

1.7 Storm Water Design Quantity Control 2

Aim: As other facets of this recognition are already achieved in the old clause, purpose of this clause is to capture the 90 % of storm H2O overflow.

Status: TBA

Attainment: The one-year rainfall in the south West of Sri Lanka is 2540mm to 5080mm ( Sri Lanka, The Land ) . So the storm H2O design has to be made consequently to catch 90 % of the storm H2O.

Points: Two

1.8 Heat Island Effect, Non-Roof

Aim: To cut down impact of heat islands affects.

Status: TBA

Attainment: Supply roof to finish parking country

Points: One

1.9 Heat Island Effect, Roof

Aim: To cut down impact of heat islands affects.

Status: TBA

Attainment: Complete roof country of the edifice is already covered with flora.

Supply all the paving stuff with SRI29 or higher

Points: One

1.10 Heat Island Effect, Roof

Aim: Exterior and Interior Lighting

To optimise the power denseness of exterior lighting

To minimise the light trespass

Status: TBA

Attainment: Use gesture sensors so the exterior lighting will be used when it is precisely needed. ( Light pollution )

Keep the visible radiations illuminated straight towards the land ( Light pollution )

Use low energy conserving visible radiations like LED.

Set timers to exchange off all internal exigency visible radiations during non-working hours

Points: One

Water Efficiency

All the sub clauses in this clause are merged together and implementation solutions provided.

Aim: To cut down or extinguish drinkable H2O ingestion

To make a H2O efficient air conditioning system

To handle waste H2O and cut down the overall H2O use

Status: Achieved

Attainment: It is assumed that the undertaking has already implemented a waste H2O intervention and solid waste direction system to whole procedure as mentioned in the undertaking.

Additionally,

Rain H2O aggregation and use must be maximized.

Maximize the usage of waste H2O for Landscaping through the procedure of H2O intervention

Recycle and recycle the drinkable H2O

Points: Fourteen

Energy & A ; Atmosphere

It is assumed that all required requirements are already achieved.

3.1 Optimize Energy Performance

Aim: To convey the entire energy use to an optimized degree and cut down the economic and environmental impacts.

Status: TBA

Attainment: Low edifice footmark is already achieved as it is less than 50 % of the entire site country

100 % usage of Bio gas will cut down the demand for energy from other beginnings

Use detector based engineering in illuming and air conditioning system

Better the design to utilize the natural lighting and airing

Points: Ten

3.2 Renewable Energy & A ; Green Power

These two clauses are merged together as they have the same beginning of accomplishment in this undertaking.

Aim: To increase the usage of onsite renewable energy for the operations

Status: Achieved

Attainment: This mill will be runing under 100 % Bio gas

Use fruit wastages to bring forth Bio gas

Additionally, Solar panels will be used to derive excess energy

Points: Seven

3.3 Additional Commission

Aim: To get down the commissioning procedure earlier with the design procedure

To guarantee that equipment operators have adequate cognition in runing the equipment

To cut down the operational cost

Status: TBA

Attainment: Develop a user ‘s manual by placing the demands to develop all the staff and operators

Review and supervise the energy use for 8 to 10 months throughout the operational period

Points: One

3.4 Ozone Depletion

Aim: To cut down the ozone depletion by extinguish the causes

Status: TBA

Attainment: Use fire suppression method which does non incorporate any ozone depletion substances

Use H2O refrigerant method

Points: One

3.5 Measurement and confirmations

Aim: To mensurate and supervise the energy ingestion and develop a program

Status: TBA

Attainment: For a period of 12 months or higher, verify the agencies of energy ingestion to mensurate it and bring forth a rectification program

Points: One

3.6 Green Power

Aim: To mensurate and supervise the energy ingestion and develop a program

Status: TBA

Attainment: For a period of 12 months or higher, verify the agencies of energy ingestion to mensurate it and bring forth a rectification program

Points: One

Energy & A ; Atmosphere

It is assumed that the requirements are already achieved for this clause.

4.1 Outdoor Air Delivery Monitoring & A ; Increased Ventilation

Aim: To supply adequate fresh air to keep a good degree of occupant comfort

Status: TBA

Attainment: A typical mechanical airing system can be a higher sum of energy and resource. And besides it may non be efficient in supplying adequate sum of fresh air at a certain clip or topographic point.

To get the better of these jobs,

CO2 and out-of-door airflow proctors must be installed

Ventilation system must be automated by detectors. And this system should move harmonizing to the dismay of airflow proctors.

Provide extra Ventilation systems to increase the airing

Points: Two

4.2 Low Emitting Materials

Paints & A ; Coatings, Carpet Systems, Composite Wood and Agri fibre Merchandises

Aim: To supply a comfy environment to the residents by take downing the air taint degree

Status: TBA

Attainment: Assume that merely low breathing stuffs will be used in this undertaking.

For illustration: Anti rust pigments, Plywood with no added Urea Formaldehyde Resins

Points: Three

4.3 Indoor chemical and pollutant beginning control

Aim: To maintain the indoor country from risky chemical pollutants

Status: TBA

Attainment: Use automated door systems

Provide high quality fumes system to warehouse

Install 6 pess long entryway system to the processing country

Points: One

4.4 Controllability of systems

Lighting and Comfort Controls are combined.

Aim: To better the controllability of illuming and thermic systems

Status: TBA

Attainment: Provide remote control system or switches to warehouse and treating country.

Provide single switches to ease the controllability

Points: Two

4.5 Thermal Comfort Design & A ; Verification

Aim: To better the productiveness of thermic comfort

To Monitor and cipher the thermic comfort degree

Status: TBA

Attainment: Ensure that the HVAC design has the ability to keep the thermic conditions like air temperature, velocity of air and humidness in a normal required degree.

Propose a study to analyze the satisfactory degrees of residents. And if the satisfactory degree is less than 80 % , make necessary agreements to rectify the system

Points: Two

4.6 Daylight and positions

Aim: To accomplish maximal use of daytime

Status: TBA

Attainment: Maximize the usage of glassy doors and Windowss to reception, offices, research lab and cafeteria.

This will better the daylight use every bit good as the positions

Points: Two

Conclusions & A ; Recommendations

Making a green undertaking can be a dearly-won exercising. But when looking in to a futuristic long term economic and environmental position, it is the most convenient and valuable pattern for the current coevals every bit good as the hereafter coevals.

In this study,

Achieved = 40 points

Minimal demand = 70 points

More to be achieved but non limited to = 30 points

So,

The act of accomplishing points should be followed with attempt as it is explained under every clause in the organic structure of this study. And it will take to the award of Green Building Platinum Rating for this undertaking.

And besides,

It is extremely recommended to maintain the green quality of this undertaking from the beginning to the operational phases throughout the whole life-time.

It is advised to hold considerations on the clauses omitted in this study.

Mentions

BuildingGreen. ( 2012 ) . Leed – Creditss. Retrieved 11 18, 2012, from www.leeduser.com: hypertext transfer protocol: //www.leeduser.com/leed-credits

Council, U. G. ( 2012 ) . LEED. Retrieved 11 17, 2012, from new.usgbc.org: hypertext transfer protocol: //new.usgbc.org/leed

Google, M. ( n.d. ) . Google Maps. Retrieved 11 17, 2012, from hypertext transfer protocol: //maps.google.ae/maps? hl=en & A ; tab=wl & A ; authuser=0

Green Building Council, S. ( 2010 ) . Green evaluation System for Built Environment. Green Building Councill, Sri Lanka. Retrieved 11 16, 2012

Light pollution. ( n.d. ) . Retrieved 11 17, 2012, from Canadianliving – 8ways to cut down light pollution: hypertext transfer protocol: //www.canadianliving.com/life/green_living/8_ways_to_reduce_light_pollution.php

Sri Lanka, The Land. ( n.d. ) . Retrieved 11 17, 2012, from My Sri Lanka: hypertext transfer protocol: //www.mysrilanka.com/travel/theland/rainfall.htm